Military T-Shirt
Tamiya Military Model Kits
Naval Warfare

US Navy Celebrates Commissioning of Nuclear Powered Attack Submarine USS Vermont (SSN 792)

480
×

US Navy Celebrates Commissioning of Nuclear Powered Attack Submarine USS Vermont (SSN 792)

Share this article
US Navy Celebrates Commissioning of Nuclear Powered Attack Submarine USS Vermont (SSN 792)
US Navy Celebrates Commissioning of Nuclear Powered Attack Submarine USS Vermont (SSN 792)

The U.S. Navy celebrated the commissioning of USS Vermont (SSN 792), the first Block IV Virginia-class submarine to enter service, Saturday, Aug. 28, at Naval Submarine Base New London. Vermont was administratively commissioned on April 18, 2020, but due to restrictions on large gatherings because of the COVID-19 pandemic at the time, no traditional commissioning ceremony was held. To ensure the health and safety of the crew and all those in attendance during the ceremony Saturday, attendance was limited and no public or media tours were held. Masks were required in all indoor spaces and encouraged in outdoor spaces.

Gloria Valdez, ship’s sponsor for the USS Vermont (SSN 792), is escorted by chief of the boat Senior Chief Petty Officer Robert Antrim as part of the official party for a commissioning commemoration onboard Naval Submarine Base New London in Groton, Conn., Aug. 28.
Gloria Valdez, ship’s sponsor for the USS Vermont (SSN 792), is escorted by chief of the boat Senior Chief Petty Officer Robert Antrim as part of the official party for a commissioning commemoration onboard Naval Submarine Base New London in Groton, Conn., Aug. 28.(U.S. Navy photo by Chief Petty Officer Joshua Karsten/RELEASED)

Since its administrative commissioning, USS Vermont has been an active submarine in the U.S. Navy, including participation in anti-submarine warfare exercises alongside the Brazilian navy in the U.S. 4th Fleet area of operations in December of 2020. In addition to Del Toro, Rear Adm. Douglas Perry, director of undersea warfare on the chief of naval operations’ staff and a Vermont native, was among those who spoke at the Saturday ceremony. Perry spoke of the legacies of previous Navy ships with Vermont ties and military heroes from the state’s past, like Ethan Allen during the Revolutionary War and 19th Century Admiral of the Navy George Dewey.

US Navy Celebrates Commissioning of Nuclear Powered Attack Submarine USS Vermont (SSN 792)
The crew of the USS Vermont (SSN 792) man the rails during a commissioning commemoration for the USS Vermont (SSN 792) onboard Naval Submarine Base New London in Groton, Conn., Aug. 28.(U.S. Navy photo by Chief Petty Officer Joshua Karsten/RELEASED)

This is the third U.S. Navy ship to bear the name Vermont, but first in a century. The first was one of nine 74-gun warships authorized by Congress in 1816. The second, Battleship No. 20, was commissioned in 1907 and first deployed in December of that year as part of the “Great White Fleet.” The battleship Vermont was decommissioned June 30, 1920. The submarine Vermont was christened in a traditional ceremony at General Dynamics’ Electric Boat shipyard in Groton, Connecticut, on Oct. 20, 2018. USS Vermont is 377 feet long, has a 34-foot beam and will be able to dive to depths greater than 800 feet and operate at speeds in excess of 25 knots submerged. She has a crew of more than 130 Navy personnel.

US Navy Celebrates Commissioning of Nuclear Powered Attack Submarine USS Vermont (SSN 792)
Rear Adm. Douglas Perry, the Navy’s director for undersea warfare, delivers remarks during a commissioning commemoration for the USS Vermont (SSN 792) onboard Naval Submarine Base New London in Groton, Conn., Aug. 28. (U.S. Navy photo by Petty Officer 3rd Class Javon Swaby/RELEASED)

Fast-attack submarines project power ashore with special operations forces and Tomahawk cruise missiles in the prevention or preparation of regional crises. Block IV Virginia-class submarines incorporate design changes focused on reduced total ownership cost. By making these smaller-scale design changes to increase the component-level lifecycle of the submarine, the Navy will increase the periodicity between depot maintenance availabilities and increase the number of deployments. Blocks I-III Virginia-class submarines are planned to undergo four depot maintenance availabilities and conduct 14 deployments. Block IV design changes are intended to reduce planned availabilities by one to three, and increase deployments to 15.

US Navy Celebrates Commissioning of Nuclear Powered Attack Submarine USS Vermont (SSN 792)
The crew of the USS Vermont (SSN 792) man the rails during a commissioning commemoration onboard Naval Submarine Base New London in Groton, Conn., Aug. 28. (U.S. Navy photo by Petty Officer 3rd Class Javon Swaby/RELEASED)

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Discover more from MilitaryLeak.COM

Subscribe now to keep reading and get access to the full archive.

Continue reading