Military T-Shirt
Tamiya Military Model Kits
Ground Warfare

US Army Aims to Modernize Command Post Integrated Infrastructure (CPI2)

223
×

US Army Aims to Modernize Command Post Integrated Infrastructure (CPI2)

Share this article
US Army Aims to Modernize Command Post Integrated Infrastructure (CPI2)
US Army Aims to Modernize Command Post Integrated Infrastructure (CPI2)

2nd Stryker Brigade Combat Team, 7th Infantry Division, Lancer Brigade, was the first unit to test the new Command Post Integrated Infrastructure (CPI2) during a brigade validation exercise, in an effort to reduce the size of the traditional command post structure and enable units to become more expeditionary. To increase the mobility and survivability of the command post structure; the Army has introduced the CPI2 as one of its top priorities for network modernization.

“We were set up in 29 minutes, but within 45 minutes we emplaced the entire brigade tactical operations center footprint compared to the old estimate which was three hours total, so it’s three times faster when we use these vehicles. We [Lancer Brigade] are the stryker brigade test unit for the CPI2. It enhances, or increases, the mobility and lethality of the command post,” Maj. Ryan Genard, 2nd Stryker Brigade Combat Team Communications Officer said when setting up the new command post.

The CPI2 program is separated into two development stages that run simultaneously in order to implement the best product to the soldiers. The first stage involves research and development, formal design, prototyping and user feedback. The second stage of the program involves the integration of communications systems, alternative mobile command post platforms, and electromagnetic spectrum reduction.

Lancer Brigade is currently undergoing increased testing with the CPI2 vehicles in order to shape future iterations. Feedback and best practices from increased testing will be incorporated into future designs. This continuous integration, experimentation and feedback incorporates Soldier Touch Points with three selected units: 2nd Stryker Brigade Combat Team, 2nd Infantry Division at Joint Base Lewis McChord, Washington; 3rd Brigade Combat Team, 101st Airborne Division-Air Assault at Fort Campbell, Kentucky; and 4th Infantry Division at Fort Carson, Colorado.

US Army Aims to Modernize Command Post Integrated Infrastructure (CPI2)
The 2nd Stryker Brigade Combat Team, 2nd Infantry Division at Joint Base Lewis-McChord conducts a validation exercise (VALEX) of prototype command post equipment in support of PEO C3T’s Command Post Integrated Infrastructure (CPI2) program. During the VALEX, the unit establishes and tests their tactics, techniques, and procedures to ensure they can use the equipment properly based on their mission. Credit: U.S. Army Photo by Spc. Dean Johnson/2nd Stryker Brigade Combat Team, 2nd Infantry Division

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Discover more from MilitaryLeak.COM

Subscribe now to keep reading and get access to the full archive.

Continue reading