Site icon MilitaryLeak.COM

Korea Aerospace Industries Plans to Roll Out First KF-X Fighter Jet in April 2021

The KoreaHerald reported that Korea Aerospace Industries (KAI) plans to roll out the first prototype of its next-generation Korean Fighter eXperimental (KF-X) fighter jet next April and commence test flights in 2022. Of the six prototypes, one will be delivered to Indonesia, co-developer of KF-X project. After the first prototype, the remaining five prototypes will come out one after another within the same year. Test flights are scheduled in 2022.KAI is set to begin the final assembly of each of the top, middle and bottom parts of the fuselage of the prototype in the second half of this year and complete the installation of equipment and parts such as cables on the prototype by April next year, according to the KAI official.

Starting with the test flights in 2022, the prototypes will then undergo four years of trials, and the development is expected to be completed by mid-2026. The first batch of mass-produced KF-X aircraft are expected between 2026 and 2028. They will be equipped with limited air-to-ground weapons in addition to air-to-air weapons. The second batch, which will be series-produced from 2029, will be capable of performing full air-to-air and air-to-ground combat missions. The first mass-produced KF-X aircraft, which will be part of Block 1, are expected between 2026 and 2028. On the other hand the Block 2 KF-Xs, which will be series-produced from 2029, will be capable of performing full air-to-air and air-to-ground combat missions.

Korea Aerospace Industries Plans to Roll Out First KF-X Fighter Jet in April 2021
A fuselage image of the first KF-X prototype at KAI‘s assembly facility in Sacheon, South Gyeongsang Province (KAI)
Exit mobile version