The British Army intends upgrading its Warriors to extend their service life to 2025. The Warrior Capability Sustainment Program (WCSP) will involve upgrading 380 of its Warriors with the Warrior Modular Protection System (WMPS) and Warrior Enhanced Electronic Architecture (WEEA). Within that group, 245 vehicles will also be fitted with a new turret and weapon system under the Warrior Fightability Lethality Improvement Program (WFLIP). Under the WFLI program, the present turret mounting the RARDEN cannon, which lacks stabilisation and is manually loaded with three-round clips, will be replaced by a turret that will mount a stabilised 40 mm weapon developed by the Anglo-French firm CTA International and firing Cased telescoped ammunition. This weapon also equip the Scout SV reconnaissance vehicle which is being developed. Severe budgetary pressures made it uncertain whether these defence projects were to be delayed or curtailed, but it was announced in October 2011 that the Warrior upgrades would proceed at a cost of one billion pounds, extending the service life of the Warrior to 2040 and beyond.